
Insulation Inspection Checklist
| |
|
ITEM |
|
Walls R-16, ceiling R-31, floor R-20 |
N1102.1.1, N1102.1.2, N1102.1.4 PG 281-283
|
Behind pipes, boxes, tubs |
|
Vapor barrier & stapling |
|
| Proper baffles |
806.3 PG 249 |
Windows, doors, t-posts |
|
| Penetrations sealed to exterior (including soleplates) |
N1102.1.10 PG 283 |
| Cathedral ceiling – 1” clearance |
|
|
|
|
|